Wichita's #1 Roofing Company

Roof Replacement

Upgrade your property with durable roof replacement services built for lasting performance and peace of mind.

Wichita's Complete Roof Replacement Specialists

At some point, every repair is just delaying the inevitable — and an aging roof that has been patched repeatedly is a liability that compounds with every storm season. At Wichita Roofing Pros, we specialize in complete roof replacements that address not just the visible surface, but the entire system beneath it: decking integrity, ventilation balance, underlayment strategy, and flashing execution at every transition point on the structure.

A replacement done right is a 25–50 year investment. Done wrong — with shortcuts on decking inspection, misapplied underlayment, or reused flashings — it becomes a 10-year problem. Our replacement crews follow a written installation checklist on every project, covering each phase from initial tear-off through final nail sweep. Every step is photographed, and every completed project is walked through our quality verification process before we consider the job closed.

We handle the complete scope in-house with no subcontractors: tear-off and haul-away, decking repair, underlayment installation, shingle layout and nailing, flashing at all valleys, walls, chimneys, and skylights, ridge cap installation, and gutter reattachment where applicable. The same experienced team that starts your roof finishes it — on schedule and without the rework that production-style crews leave behind.

Roofs Replaced
0 +
Serving Wichita
0 Yrs
Average Google Rating
0

Everything That Goes Into a Proper Replacement

Complete Tear-Off to Bare Deck

We strip all existing layers — shingles, underlayment, and flashings — down to the wood decking before any new material is applied. No layovers, no covering up problems with new material on top.

Decking Board Replacement

Every sheet of plywood or OSB decking is evaluated during tear-off. Delaminated, soft, or mold-stained boards are replaced at documented cost before the new roofing system goes down.

Synthetic Underlayment & Ice and Water Shield

High-performance synthetic underlayment is installed over the full deck surface, with self-adhering ice and water shield at all eaves, valleys, and flashings — the moisture-management backbone of the new system.

Full Flashing Replacement

All step flashing, valley flashing, chimney counterflashing, and wall flashings are replaced with new galvanized or copper material — never reused from the old system as is common practice at lower-tier competitors.

Roofing Systems We Replace With

GAF Timberline HDZ

The top-selling shingle in North America — Class 4 impact-resistant option available, StainGuard Plus algae protection, and LayerLock technology delivering wind resistance ratings up to 130 mph.

Owens Corning Duration Series

SureNail technology with triple-layer reinforcement at the fastening zone — one of the highest nail pull-through resistance ratings in the asphalt shingle category, with Class 4 impact versions available.

CertainTeed Landmark Pro

Dual-layer laminate construction with a 15-year StreakFighter algae resistance warranty and a 110 mph wind warranty standard — available in an expanded color range for architectural contrast.

Standing Seam Metal Replacement Systems

Structural concealed-fastener metal panels for homeowners seeking maximum longevity — 50-year lifespans, Class 4 impact ratings, and energy-reflective coatings that reduce attic temperatures by 20–30°F.

Brands We Trust & Install

HOW YOUR ROOF REPLACEMENT GETS DONE

A full replacement involves multiple coordinated phases. Here is exactly what happens from the moment you approve the estimate to the day the crew loads out.

Materials Delivered & Site Protected

Shingles, underlayment, and accessories arrive the day before or morning of installation. Tarps protect landscaping, driveways, and HVAC units before any tear-off activity begins.

01

Tear-Off & Deck Repair

All existing material is stripped and hauled to our trailer. Decking is inspected square by square and repaired as needed — with the homeowner notified of any additional board costs before replacement.

02

New System Installation

Underlayment, ice and water shield, flashing, shingles, and ridge cap are installed in sequence per manufacturer specifications — nailing patterns and overlap dimensions verified throughout.

03

Final Inspection & Magnetic Nail Sweep

The finished roof is inspected for alignment, ridge consistency, and flashing integrity. A rolling magnet sweeps the entire yard for nails and staples before the crew loads out for the day.

04

Residential Roofing FAQ

How long should a new roof last in Wichita?
A quality asphalt shingle replacement installed on sound decking typically lasts 25–40 years depending on shingle tier. Architectural laminate shingles routinely reach their rated lifespan when properly ventilated. Class 4 impact-resistant shingles extend service life further by resisting the granule loss that hail causes on standard products. Metal replacements are rated for 50+ years. The single biggest factor after material quality is attic ventilation — a poorly ventilated attic can reduce shingle lifespan by 30–40% through heat cycling.
Color affects both aesthetics and thermal performance. Lighter shingles reflect more solar radiation and keep attic temperatures lower — a benefit in Wichita’s hot summers. Darker shingles absorb heat faster, which helps melt snow in winter but adds cooling load in summer. We bring physical shingle samples and can pull up rendering tools that show your roofline in different color options before you commit. Neutral brown-gray-slate tones consistently perform best in the Wichita resale market.
We monitor forecasts closely before scheduling and won’t start a tear-off if rain is expected within the installation window. If an unexpected storm moves in during active work, we carry enough synthetic underlayment and emergency sheeting to weatherproof the entire exposed deck before securing the site. A fully underlaid deck sheds water nearly as effectively as a finished roof for short durations. We have never left a homeowner with an unprotected deck overnight.
Yes. Most residential replacements are single-day projects completed while homeowners are present. The interior noise during active nailing is comparable to sustained hail, so some homeowners with young children, pets, or home offices prefer to arrange a temporary workspace for the tear-off portion of the day. We provide a confirmed start time and a realistic completion window so you can plan your schedule accordingly.
Yes — consistently. A new roof is one of the highest-ROI exterior upgrades in the Wichita residential market. Buyers and home inspectors flag aging roofs immediately, and most lenders require roof certification for conventional financing approval. Homes with aging roofs sell for less and sit on the market longer — a new roof removes that negotiating liability entirely and signals to buyers that the property has been properly maintained.

Start Your Roofing Project with Our Professionals!

Related Roofing Services

Soffit, Fascia & Trim

Complete soffit, fascia, and exterior trim replacement – the finishing touches that protect your roofline and complete your home's look.

Hardie / Fiber Cement

James Hardie fiber cement siding – fire-resistant, weather-tough, and the most trusted siding brand in America.

Free Roof Inspection

No-cost, no-obligation roof inspection – we climb your roof, document everything, and give you honest recommendations.

Storm & Hail Damage

Emergency storm damage repair and full hail damage assessment – we respond fast and work directly with your insurance.

Insurance Claim Replacement

Storm damage claim specialists who work directly with your insurance company – you pay only your deductible.

Full Tear-Off & Replace

Complete roof replacement from deck up – no shortcuts, no layovers, and no hidden surprises.

Start Your Roof Replacement with Wichita's Most Experienced Crew

Schedule your free replacement assessment and get a detailed written estimate — most projects are installed within 2 weeks of your approval.